“The Real Cost of Highway Development- Who has got the numbers right?” by Professor Amal S. Kumarage

The extension of the Southern Highway from Matara to Beliatta however appears to be in a class of its own is over priced by an astounding 545%. The common denominator of all these projects is that they were funded with Chinese borrowings and contracts have all been awarded in 2014 without calling for competitive bids. The loss arising from these 4 projects alone is estimated at Rs 200 billion.

Via http://www.sundaytimes.lk/141221/Cost%20of%20Expressways.pdf


OpenEdition vous propose de citer ce billet de la manière suivante :
DM (22 décembre 2014). “The Real Cost of Highway Development- Who has got the numbers right?” by Professor Amal S. Kumarage. SRI LANKA & DIASPORAS. Consulté le 14 décembre 2024 à l’adresse https://doi.org/10.58079/u8iq


Laisser un commentaire

Votre adresse e-mail ne sera pas publiée. Les champs obligatoires sont indiqués avec *

Ce site utilise Akismet pour réduire les indésirables. En savoir plus sur comment les données de vos commentaires sont utilisées.